Regulatory and protocol clock Law · EU

FuelEU: shore power for container and passenger ships at berth

Onshore power supply obligation at berth on 1 Jan 2030, in 3 years.

1 Jan 2030 in 3 years Upcoming

FuelEU: shore power for container and passenger ships at berth

Onshore power supply obligation at berth · Regulation (EU) 2023/1805 Article 6; Regulation (EU) 2023/1804 (AFIR) Article 9 · European Commission and Member State port authorities

MaritimeInfrastructure EU Law

From 1 January 2030 container ships and passenger ships above 5,000 GT moored at the quayside in TEN-T ports covered by AFIR must connect to onshore power supply, or use a zero-emission technology, for all electricity needs at berth, with limited exceptions such as stays under two hours. From 1 January 2035 the same applies in any EU port where OPS is available. Ports must have the shore-side installations ready under AFIR by the same date.

EUR-Lex · European Commission (DG MOVE)

What to do 0 of 4 done

Ticks are kept in this browser only. Sign in to the client portal to share them with your team.

Need this tracked for your fleet or plant?

In the client portal the same checklist is shared with your team, the ticks are kept, and the entry sits next to the registers that prove what you did.